this post was submitted on 09 Jul 2023
501 points (100.0% liked)

Technology

34976 readers
126 users here now

This is the official technology community of Lemmy.ml for all news related to creation and use of technology, and to facilitate civil, meaningful discussion around it.


Ask in DM before posting product reviews or ads. All such posts otherwise are subject to removal.


Rules:

1: All Lemmy rules apply

2: Do not post low effort posts

3: NEVER post naziped*gore stuff

4: Always post article URLs or their archived version URLs as sources, NOT screenshots. Help the blind users.

5: personal rants of Big Tech CEOs like Elon Musk are unwelcome (does not include posts about their companies affecting wide range of people)

6: no advertisement posts unless verified as legitimate and non-exploitative/non-consumerist

7: crypto related posts, unless essential, are disallowed

founded 5 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] kiddblur@lemm.ee 14 points 1 year ago (1 children)

Hey I mean credit where credit’s due. If they can somehow cram a 200kWh battery with megawatt charging to get 700 miles and 10 minute charges into a Toyota priced car, so be it. Can’t imagine that’d be possible since that would be like 20-30k in battery cost alone, and there aren’t any chargers who can deliver that kind of power right now anyway.

At 350kW peak, I wonder what the miles per kwh would need to be to charge 700 miles of range in 10 minutes. That’s 58.3kWh delivered. So uhhhh they’d need to get 12 miles per kwh which would be uhhhh nuts

10 minutes at 350kw (assuming you hold peak the whole time) would provide

[–] schroedingershat@lemmy.world 2 points 1 year ago

If we correct for toyota falseadvertising range estimates (-10%), assume they mean 90km/h at similar consumption as a model 3 in ideal coditios (around 120Wh/km), and take "a charge" as 10-80% then it needs 90kWh or about half a megawatt.

So still not within current chargers, but well within what a megawatt charger would provide (and there are four standards basically ready to roll out).