this post was submitted on 09 Nov 2023
279 points (98.3% liked)

Technology

59440 readers
3442 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[โ€“] ColeSloth@discuss.tchncs.de 9 points 1 year ago (1 children)

Maybe. I would imagine that having all the portions built at one location and shipped/installed at the site would be quicker and have less variation in final cost.

The last US nuclear power plant built wound up being 7 years late and a face shattering $17,000,000,000 over budget. Who wants something to take an extra unexpected 7 years to have something built and pay seventeen billion dollars more than you planned on to get it?

[โ€“] NotMyOldRedditName@lemmy.world 7 points 1 year ago* (last edited 1 year ago)

Less land required as well which is also cheaper.

But ya, being and to produce them in a factory was going to be a big savings. They'd get cheaper as things improved.