this post was submitted on 25 Nov 2023
2 points (100.0% liked)

Homelab

371 readers
9 users here now

Rules

founded 1 year ago
MODERATORS
 

Hey folks!

I built a barndo in my backyard where my server is going to live. We are pre-drywall and I've run all my CAT to where my patch panel will be. It's going to be in a server box that's hung on the wall. My question is simple, but I'm one of those that tend to overthink. I can remove the back panel and run everything through the wall into the back which would be really clean. There's also the access two panels on the top and bottom of the box to run cables as well, but it would breach the wall above or below, and I can't think of an advantage of not putting it directly behind the box.

Is there any downside to taking the back panel off? Is there anything I should know before hanging it? I'm using the included bracket and aiming for the middle of the stud. It's a NavePoint 12U 600mm depth for reference.

This question sounds silly, but I've saved a LONG time for this, and really want to nail it (pun intended).

you are viewing a single comment's thread
view the rest of the comments
[–] ethylalcohoe@alien.top 1 points 1 year ago

Hmmm... help me understand the purpose of the media enclosure. The CAT is already run through the wall studs when we framed the building.