this post was submitted on 12 Jul 2024
14 points (81.8% liked)

[Dormant] Electric Vehicles

3206 readers
1 users here now

We have moved to:

!electricvehicles@slrpnk.net

A community for the sharing of links, news, and discussion related to Electric Vehicles.

Rules

  1. No bigotry - including racism, sexism, ableism, casteism, speciesism, homophobia, transphobia, or xenophobia.
  2. Be respectful, especially when disagreeing. Everyone should feel welcome here.
  3. No self-promotion.
  4. No irrelevant content. All posts must be relevant and related to plug-in electric vehicles — BEVs or PHEVs.
  5. No trolling.
  6. Policy, not politics. Submissions and comments about effective policymaking are allowed and encouraged in the community, however conversations and submissions about parties, politicians, and those devolving into general tribalism will be removed.

founded 1 year ago
MODERATORS
 

At one point I thought that if the Government was giving money for EV chargers, they would be either at-cost or free to use.

One of the first built was at a Flying J truck stop in Ohio.

I looked on plug share and found one in Hubbard, OH and it's 67c per kwh (https://www.plugshare.com/location/582660). The average cost of electricity in that area is less than 15c per kwh. At that kind of price, gas could be a cheaper option.

Why does the government subsidize in a way where already wealthy companies get public money to build chargers, and make a ton more money off the rest of us?

(This is not a political statement at all. I just don't understand why public money goes to make certain private folks more wealthy. I figure I must be missing something).

Thanks for your thoughts!

you are viewing a single comment's thread
view the rest of the comments
[–] Cort@lemmy.world 3 points 4 months ago (1 children)

Downtime or disrepair should have been penalized on subsidized stations to force some reinvestment of those profits I think. Otherwise this whole thing turns into the broadband debacle.

[–] mosiacmango@lemm.ee 1 points 4 months ago

Any disincentive may act against the core goal, so you have to weigh their value.

No one wants broken garbage installed, but if they do get installed and can be fixed, youre still farther along the "get infastructure deployed" timeline.