this post was submitted on 17 Sep 2024
98 points (100.0% liked)

Machinist

672 readers
7 users here now

From Newcomers to Old Timers, a community united by the Industry of Machining

Rules Don't post illegal stuff

Don't post Porn (no sexy aluminum surface finishes don't count)

Don't be an asshat (harassment, bullying etc.)

If you're going to post NSFW stuff, flag it as NSFW, It's ok to post shop Screwups (blood/cuts) just make sure to flag it as NSFW

and Finally make sure to have a good time :D

founded 1 year ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[โ€“] HootinNHollerin@lemmy.world 5 points 1 month ago* (last edited 1 month ago) (1 children)

As a mechanical engineer, I get asked by my management to expedite the machining just for the prototype I built to sit there unused because the person to run the experiments is too busy

[โ€“] jawa21@lemmy.sdf.org 3 points 1 month ago

Sounds like they conceptually understand that engineering time is expensive, but have absolutely no idea about the process they are managing. Kinda like they are paying for the expensive experiments so the people doing them have to have a back log so they are always overworked.