this post was submitted on 26 Aug 2023
140 points (94.3% liked)

Green Energy

2110 readers
103 users here now

everything about energy production

founded 2 years ago
MODERATORS
 

Uranium is $128.30/kg

After enrichment, conversion and fabrication that's $3400/kg for 4.95% fuel.

At 36-45MWd/kg and a net thermal efficiency of 25% or $12.5/MWh up front.

With a 90 month lead time (72 month fuel cycle and 18 months inventory) at 3% this is $16.2/MWh

Which some solar projects are now matching

you are viewing a single comment's thread
view the rest of the comments
[โ€“] chaogomu@kbin.social 1 points 1 year ago (1 children)

I said,

There are a dozen reactor designs that can handle thorium. We just need to let people build them.

But every reply I've gotten from you has been you not actually addressing what I've said, but you, instead, seem to be replying to what you wish I'd said. There's some disconnect.

Ah so now it's one of those superposition reactors which has the all the upsides all the different people trying to sell them imagined after building half of one and having it fall apart in a year, but none of the downsides. Also a U235 reactor running Th in place of U238 for a breeding ratio of 0.5 somehow means U235 ia sn't needed anymore.

The disconnect is you are pretending a half-proof-of-concept of the easiest bit is all the hard bits being complete.