this post was submitted on 05 Aug 2024
43 points (97.8% liked)

chapotraphouse

13545 readers
820 users here now

Banned? DM Wmill to appeal.

No anti-nautilism posts. See: Eco-fascism Primer

Gossip posts go in c/gossip. Don't post low-hanging fruit here after it gets removed from c/gossip

founded 3 years ago
MODERATORS
 

"It doesn't count because it's just passenger rail!!! The U.S. has the largest freight rail system!!"

some-controversy cope, crackers

you are viewing a single comment's thread
view the rest of the comments
[–] AntiOutsideAktion@hexbear.net 18 points 3 months ago (2 children)

"Look how awesome our freight rail is!"

[–] Black_Mald_Futures@hexbear.net 23 points 3 months ago (1 children)

not pictured: our freight rail

[–] Adkml@hexbear.net 17 points 3 months ago (1 children)

That's because it's 4 hours behind schedule because it got sidetracked and the train that had priority had one engineer for 120 cars.

[–] wtypstanaccount04@hexbear.net 4 points 3 months ago (1 children)

4 hours behind schedule is a typical Amtrak delay.

You have no idea how delayed freight trains can get

[–] Adkml@hexbear.net 2 points 3 months ago* (last edited 3 months ago) (1 children)

Yea that's because our rail infrastructure is shit and rail companies have one person conducting 100+ car long trains.

Dozens of other countries figured this out decades ago, it's not that we can't it's that we very consciously do not want to.

[–] wtypstanaccount04@hexbear.net 1 points 3 months ago

Two-person crews are mandated now on all railroads (with some exceptions), but that's probably still not enough for how long some of the trains are. Without two-person crews you get Lac-Megantic.